New York Devises Distress Signal for Sewer System

Dec 09

New York Devises Distress Signal for Sewer System

Various Cities throughout New York have recently implemented a cost-effective program to assist homeowners in the detection of a possible sewer problem, thwarting it before it begins. The Sewer Back-Up Alert System is a solar powered sensory and communications system designed to alert a homeowner of a sewer back up on their property. By providing a practical early...

Read More

Sewer Reconstruction Advisory for Batavia

Apr 28

Sewer Reconstruction Advisory for Batavia

The town of Batavia is beginning a sewer rehabilitation project at the beginning of the month. The Washington Avenue Sewer Project is expected to impact traffic once construction begins. Washington Avenue will be limited to local traffic only in the specific section that is being worked on. The first section to be closed off will be Bank Street to Summit Street,...

Read More

Sewer Construction Advisory for Section of the Bronx

Apr 13

Sewer Construction Advisory for Section of the Bronx

A major sewer system construction project is now under way in the Kingsbridge Heights area of the Bronx.  In light of this, traffic is expected to be in disarray and water supply may be randomly cut through the end of the year. The New York City Department of Design and Construction (DDC) is overseeing the project that will replace worn out mains, install catch...

Read More

Ogdensburg’s Sewer System Project

Aug 19

Ogdensburg’s Sewer System Project

Residents of Ogdensburg, your sewer line replacement is in effect and taking place at the old gas plant in Niagara Mohawk.  The Department of Environmental Conservation, has initiated an enhancement to the underground infrastructure that will replace approximately 180 ft. of sewer line pipes along King St North of the former gas plant.   The regulations regarding...

Read More

GOT PROFIT??

Apr 15

GOT PROFIT??

Got Profit? Zero Down. No Payments for 90-Days. Package Includes 600 FT of Liner Materials (Liner, Calibration Tube, Pull Tape and Epoxy Resins) VISIT OUR WEBSITE BREAKDOWN TO PROFIT: – 600 feet minus 50 feet in waste = 550 FT – Average Perma-Lateral™ liner installed pricing $75.00 – $100.00 a foot. – 550 FT...

Read More

WWETT 2015: LIVE DEMOS at #3223

Feb 12

WWETT 2015: LIVE DEMOS at #3223

Perma-Liner™ (PLI) is the leading manufacturer and supplier of trenchless pipeline rehabilitation equipment & materials in North America. Since 1999, PLI has developed systems to rehabilitate existing sewer systems without excavation. Our experience in the CIPP (Cured-In-Place-Pipe) industry has allowed Perma-Liner™ to design, patent, and manufacture state of...

Read More